Grade C 3 Inch Galvanized Pipe 10 Ft API 5L GI Hollow Pipe
Product Name
|
Hot Dip Galvanized Round Steel Pipe / GI Pipe Pre Galvanized Steel Pipe Galvanized Tube For Construction
|
Material
|
10#, 20#, 45#, 16Mn, A53(A,B), Q235, Q345, Q195, Q215, St37, St42, St37-2, St35.4, St52.4, ST35
|
Wall Thickness
|
1MM~12MM
|
Outer Diameter
|
20MM~508MM
|
Length
|
Length:Single random length/Double random length
5m-14m,5.8m,6m,10m-12m,12m or as customer's actual reques |
Standard |
API 5L, ASTM A53-2007, ASTM A671-2006, ASTM A252-1998, ASTM A450-1996, ASME B36.10M-2004, ASTM A523-1996, BS 1387, BS EN10296, BS 6323, BS 6363, BS EN10219, GB/T 3091-2001, GB/T 13793-1992, GB/T9711
|
Grade |
10#-45#, 16Mn, A53-A369, Q195-Q345, ST35-ST52
Grade A, Grade B, Grade C |
Technique
|
Hot Dip Galvanized Round Steel Pipe
|
Packing
|
Bundle, or with all kinds of colors PVC or as your requirements
|
Pipe Ends
|
Plain end/Beveled,protected by plastic caps on both ends, cut quare,grooved,threaded and coupling,etc.
|
Surface Treatment |
1. Galvanized
2. PVC,Black and color painting 3. Transparent oil,anti-rust oil 4. According to clients requirement |
Product Application
|
1. Fence, greenhouse, door pipe,greenhouse
2. Low pressure liquid, water, gas, oil, line pipe 3. For both indoor and outdoor the building construction 4. Widely used in scaffolding construction which is much cheaper and convenient |
Origin
|
Tianjin China
|
Certificates
|
API ISO9001-2008,SGS.BV
|
Delivery Time
|
Usually within 10-45 days after receipt of advance payment
|
Q: How long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock. Or it is 15-20 days if the goods are not in stock, it is according to quantity.
Q: Do you provide samples ? is it free or extra?
A:Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q: What is your MOQ?
A: Usually our MOQ is 5t. But if your quantity is small, the price may be a little higher. When there is a big quantity, the price will be quite lower.
Q:How to buy your ideal products?
A: You can provide us your drawing, and we will produce as your drawing. Or we can design as your requirements if you do not have a clear plan.
Q:How to pay?
A: TT and L/C are acceptable and TT will be more appreciated.30% deposit before producing, 70% balance before loading by TT.
Q:How to install after the goods destination?
A: We will provide installation instruction and video for you. Technicians will be sent to help you if it is necessary. However, the visa fee, air tickets, accommodation, wages will be provided by buyers.
Q:How to get an accurate quotation?
A:Product detail size & Length,product quantities,product material grade.
Contact Us at Any Time